Home Page About us Forum MIL
Tracuu
 



Username
Password
 
Member Register


 
 
 
Login

     

Kenya launches mega rail project

11/30/2013 9:24:32 AM

Kenya has launched a US$13.8 billion flagship railway project linking the port city of Mombasa to the capital Nairobi and is eventually hoped to extend onwards to neighbouring Uganda.

The project, called a "historic milestone" by President Uhuru Kenyatta, who presided over a ground-breaking in Mombasa, will also connect with proposed lines to Rwanda and South Sudan, according to the AFP news agency, reported Al Jazeera.

Built by a Chinese state-owned firm and with funds from the Chinese government, the railway line is expected to dramatically increase trade and boost Kenya's position as a regional economic powerhouse.

Kenya, Uganda, Tanzania, Rwanda and Burundi form the East African Community, a regional bloc that the five nations have used to boost economic integration.

"What we are doing here today will most definitely transform not only Kenya but the whole eastern African region," Kenyatta told crowds at the ceremony, which was attended by Chinese officials.
"As a result East Africa will become a competitive investment destination. A busy growing East Africa is good for us a country."

The new railway line will replace the dilapidated British colonial-era railway, and has been hailed by the Kenyan media as the region's largest infrastructure project for a century.
"Kenya is stepping forward. It will be a landmark project both for Kenya and East Africa," said Liu Guangyuan, China's ambassador to Kenya.

Financing, currently only from China, has so far been made for only the first 450km section from Mombasa to Nairobi, replacing the current single train line with a high-speed standard gauge track, as well as building an additional line alongside.

Work on that section, by the China Road and Bridge Corporation (CRBC), is expected to be completed by 2017.

CRBC completed in August the first-stage of an expansion to Mombasa's port, including a berth able to handle 50,000 tonne container ships.

According to plans, the new lines would see passenger journey times cut from the current 12 hours to around four, which is around half the current driving time on crowded and pot-holed roads.

Freight trains are planned to be able to cut the current 36-hour trip by rail to just eight, a major boost for regional landlocked nations, with planners claiming it will slash cargo transport costs by 60 percent.

Cargonews Asia

RELATED NEWS
OTHER NEWS
COMMENTS

Your comment

Content:
Email / Name / Tel:
 
The most comprehensive and easy-to-use global marine weather application
With the Courtesy of Bao Hoang Yachts Co.
Click "HERE" to get your own 30day free trail
or contact Ms Phuong Bui at Vietnam Shipper:
phuongbq@vil.com.vn / 08.39330 148

On its way to develop alternative energy-sources for greener aviation, Airbus is also supporting basic research activities for electric aircraft concepts “eGenius”...
more ...
 
Which column are you most interested in VietnamShipper?
Very great
Great
Normal
Not very great

© 2005 Copyright byVietnam Institute of Logistics/ Vietnam Shipper. All right reserved. --- Contact for Advertisement

25th Floor, Pearl Plaza - 561A Dien Bien Phu Str., Binh Thanh Dist. HCMC - Vietnam - Tel: (+84.8) 3513 6399 - Fax: (+84.8) 3513 6359 - Email: admin@vietnamshipper.com